You are not logged in. Login

Browse by Series - EJCDC Contract Documents

Select a series from the left menu to view a list of books in that particular series. The most recent books are listed first.


Product Image
EJCDC Contract Document No. D500, 2009

Prepared by the Engineers Joint Contract Documents Committee (EJCDC).

Standard Form of Agreement between Owner and Owner's Consultant for Design Professional Services on Design/Build Projects covers the duties and responsibilities of an engineer who provides services directly to the owner, such as study and report phase services, preparation of the request for proposal, review of design/builder's drawings and specifications, and construction administration services.

Product Image
EJCDC Contract Document No. D505, 2009

Prepared by the Engineers Joint Contract Documents Committee (EJCDC).

The design/builder would use Standard Form of Subagreement between Design/Builder and Engineer for Design Professional Services when an engineer has been retained to provide design professional services.

Product Image
EJCDC Contract Document No. D510, 2009

Prepared by the Engineers Joint Contract Documents Committee (EJCDC).

Standard Form of Ageement between Owner and Design/Builder for Preliminary Services is used to set out the basic duties and responsibilities between the owner and design/builder for preliminary services, covering study and report phase, technical exhibit phase, proposal phase, and additional services. Also includes standards of performance, use of documents, electronic media, study and design phase insurance, dispute resolution, and more.

Product Image
EJCDC Contract Document No. D520, 2009

Prepared by the Engineers Joint Contract Documents Committee (EJCDC).

Standard Form of Ageement between Owner and Design/Bulider for Preliminary Services is used to set out the basic duties and responsibilities between the owner and design/builder for preliminary services, covering study and report phase, technical exhibit phase, proposal phase, and additional services. Also includes standards of performance, use of documents, electronic media, study and design phase insurance, dispute resolution, and more.

Product Image
EJCDC Contract Document No. D521, 2009

Prepared by the Engineers Joint Contract Documents Committee (EJCDC).

Standard Form of Subagreement between Design/Builder and Subcontractor on the Basis of a Stipulated Price provides for compensation on the basis of lump sum payment, unit price, or both.

Product Image
EJCDC Contract Document No. D525, 2009

Prepared by the Engineers Joint Contract Documents Committee (EJCDC).

Standard Form of Agreement between Owner and Design/Builder on the Basis of Cost Plus provides for compensation on the basis of the cost of the work plus a fee, with a provision for a guaranteed maximum price.

Product Image
EJCDC Contract Document No. D526, 2009

Prepared by the Engineers Joint Contract Documents Committee (EJCDC).

Standard Form of Subagreement between Design/Builder and Subcontractor on the Basis of Cost Plus provides for compensation on the basis of the cost of the work plus a fee, with a provision for a guaranteed maximum price.

Product Image
EJCDC Contract Document No. D610, 2009

Prepared by the Engineers Joint Contract Documents Committee (EJCDC).

Design/Build Contract Performance Bond is used to assure the availability of funds to complete a design/build project.

Product Image
EJCDC Contract Document No. D615, 2009

Prepared by the Engineers Joint Contract Documents Committee (EJCDC).

Design/Build Contract Payment Bond is used to assure the availability of sufficient funds to pay for labor, materials, and equipment used in design/build projects.

Product Image
EJCDC Contract Document No. D700, 2009

Prepared by the Engineers Joint Contract Documents Committee (EJCDC).

Standard General Conditions of the Contract between Owner and Design/Builder is used to allocate the basic duties and responsibilities between the owner and design/builder.

Showing 41 - 50 of 70 results.