MOP 79 provides practical, comprehensive guidance regarding the technical, economic, safety, and environmental aspects of designing and implementing steel penstocks at hydroelectric power stations.
This collection contains 152 papers presented at the Pipelines 2010 Conference, held in Keystone, Colorado, August 28-September 1, 2010.
MOP 120 describes technologies used by engineers and transportation professionals in renewing culverts and drainage structures under roads, railroads, airport runways, streets, and similar structures.
Mohammad Najafi offers the first detailed guide to pipe installation and renewal using trenchless technology methods, explaining how to create a more efficient process for the design, construction, and inspection of trenchless technology piping.