Louisville, KY, Riverbank Filtration Tunnel and Pump Station

Louisvill Filtration Tunnel construction

Riverbank Filtration Tunnel and Pump Station

Riverbank Filtration Tunnel and Pump StationLocation: Louisville, Kentucky, United States

Project owner: Louisville Water Company

Project type: Drinking water and wastewater

Budget: $20 million - $50 million

Project description: The Riverbank Filtration Tunnel and Pump Station project at the B.E. Payne Treatment Plant has been developed to exceed new regulations required by the Safe Drinking Water Act that will take effect in 2012. Riverbank Filtration (RBF) is a “green supply” purification process that uses the natural filtering processes of the riverbank to remove many of the particles and contaminants from the raw river water, which produces 70 million gallons of clean water each day. The Louisville Water Company is the first water utility in the world to combine a gravity tunnel with wells as a source for drinking water.

How it satisfies the "triple bottom line" approach (economic, environmental, social), including innovative aspects:
Economic:
This $55-million dollar project was designed to save money because the naturally filtered water requires less treatment and the stable water temperature results in fewer water main breaks.
Environmental: Water from the Ohio River is filtered through the natural sand and gravel of the riverbank and then is pumped into the plant for additional treatment. RBF provides an additional barrier for pathogen removal such as cryptosporidium and giardia, reduces risks associated with hazardous chemical spills, removes herbicides and pesticides in the water, and eliminates problems caused by Zebra mussels and Asiatic clams clogging water intakes. The RBF process offers benefits such as low disinfection by-products in the finished water.
Social: Planners worked closely with the local community to find a solution that would preserve the aesthetics of the neighborhood. Since River Road is part of a National Scenic Byway with historic homes along the river, the decision to use a deep underground tunnel to collect the water as opposed to above-ground standard vertical wells was important.

Categories of innovation: Water resources and environment, resource management including waste

Additional resources for information:
Riverbank Filtration Tunnel and Pump Station, 502-410-4579
Louisville Water Company, 502-583-6610

For more about this project: Charles Absher, Senior Water Resources Engineer, Jordan, Jones & Goulding, Inc.; charles.absher@jjg.com

Submitted by: ASCE

Date submitted: June 29, 2011
 


The statements expressed in these profiles are those of the individual authors only and do not necessarily reflect the views of ASCE. ASCE makes no representation or warranty of any kind, express or implied, concerning the accuracy, completeness, or usefulness of any information contained herein, and disclaims all liability for the same. No reference to any method, product, process, or service constitutes or implies an endorsement, recommendation, or warranty thereof by ASCE. These profiles are provided for general information only and are not a substitute for professional advice. Anyone using these profiles or any information therein assumes all risk and liability arising from such use.
 

 

 

Customer Ratings

Reader Reviews

By Anonymous
 

Submit a Project Profile

Know of an infrastructure project that's an example of sustainability in action?
Submit it to ASCE