San Leandro, CA, Bancroft Avenue Roadway Reconstruction

Bancroft Ave San Leandro CA

Bancroft Avenue Roadway Reconstruction Project

Location: San Leandro, California, United States

Project owner: City of San Leandro

Project type: Roads

Budget: $1 million - $5 million

Project description: Bancroft Avenue in San Leandro needed to be rebuilt due to severe base failure of the pavement section. Complete reconstruction required removing the existing failed section and replacing it with imported aggregate and Hot Mix Asphalt. HSI Engineering introduced the economical, sustainable and stable process of Full Depth Rehabilitation as an alternative method of reconstruction. FDR recycles the existing pavement materials in-place and enhances them with cement to form a base for new HMA overlay.

How it satisfies the "triple bottom line" approach (economic, environmental, social), including innovative aspects:
Economic:
By using FDR on the Bancroft Avenue Roadway Reconstruction Project, the city was able to save 45% on the upfront costs of rebuilding the road. Since the new road will last longer than a traditionally designed road, the city will also save on the long-term costs of maintaining it. The initial cost savings of using FDR was drastic: Remove and replace cost $7.39 per square foot, while Full Depth Rehabilitation cost $4.05 per square foot of roadway.
Environmental: By using Full Depth Rehabilitation on Bancroft Avenue, the City eliminated the need for the old pavement materials to be trucked to a landfill and new quarried rock to be trucked in—this reduced the construction traffic significantly which meant less impact to other city roads, less diesel fuel used, less air pollution and less traffic congestion. FDR allowed the City to re-use a valuable resource- the existing in-place aggregate base and pulverized asphalt- instead of the more environmentally wasteful process of completely removing and replacing the entire roadway.
Social: Based on the success of using Full Depth Rehabilitation, and the costs savings realized by the City, the City of San Leandro has been able to revitalize over 20 of the cities failing roads. The City can now do more with their road reconstruction budget and provide better, longer lasting roads, for less money, to their residents and traveling motorists.

Categories of innovation: Communities: long and short term effects
Resource management including waste

Additional resources for information: http://www.fulldepthrehabilitation.com/
Donatas Greb, P.E., Vice-President, HSI Engineering; don@hsi-engineering.com 925-468-6000

For more about this project: http://www.fulldepthrehabilitation.com/index.php/fdr-projects/

Submitted by: Donatas Greb, P.E., Vice-President, HSI Engineering don@hsi-engineering.com 925-468-6000

Date submitted:
 October 28, 2011
 


The statements expressed in these profiles are those of the individual authors only and do not necessarily reflect the views of ASCE. ASCE makes no representation or warranty of any kind, express or implied, concerning the accuracy, completeness, or usefulness of any information contained herein, and disclaims all liability for the same. No reference to any method, product, process, or service constitutes or implies an endorsement, recommendation, or warranty thereof by ASCE. These profiles are provided for general information only and are not a substitute for professional advice. Anyone using these profiles or any information therein assumes all risk and liability arising from such use.