You are not logged in. Login

C2P Electrical Installation Pract. for Critical Facilities

Purpose: To develop standards for electrical load equipment, such as atmosphere segregation and hazardous agent monitoring systems, as well as changes to blast and shock considerations. The standards will also cover constraints not previously considered in the design of electrical systems building mission and life-safety systems.

Roster

James A. Ruggieri, P.E., BSCP, M.ASCE, Chair
Rupert Chandler, Vice-Chair
Vytenis Babrauskas, Ph.D.
Scott Davidow
Paul Devlin
Charles C. Franklin, P.E., M.ASCE
Thomas E. Glavinich, Ph.D., P.E.
Brian Haydon, P.E.
James R. Hoover
James D. Palmer, P.E., S.E., M.ASCE
Robert Schuerger, P.E.
Brooke Stauffer
David E. Weems
Song Xing, Ph.D.

Parent Committee

TECHNICAL COMMITTEES