| Tuesday, July 15 |
| Period 05 | 8:20 AM - 9:40 AM |
| Track: A - Asset Management, Planning & Design |
Session 5A - Pipeline Design I
Moderator
Grant Whittle, P.E., Ultraliner
72-Inch Parallel Transmission Main Needs to Know for Design and Construction
Frank Eskridge, Greenville Water System
Mike Sharpless
Pat Rogers
PROJECT MANAGEMENT PIPELINE HYDRAULIC ANALYSIS: Design and Construction of 9,599m (31,492 LF) of 137cm (54)/122cm (48) Finished Water Transmission Main Henrico County, Virginia
Daniel Seli, Whitman, Requardt and Associates
Ralph Claytor
Larry Sivak
Performance of Shallow Cover Method with Geogrid at Large Blasting Test
Satoshi Suenaga, Researcher, National Institute for Rural Engineering, Chuo-ku, Japan
Yoshiyuki Mohri
Kennichi Matsushima
Three-Dimensional Response of Buried Pipe Under Vehicle Loads
Munaz A. Noor, Assistant Professor, Bangladesh University of Engineering and Technology, Dhaka, Bangladesh
Ashutosh S. Dhar
| Track: B - Condition Assessment |
Session 5B - Condition Assessment for Sewer Lines II
Moderator
Alison Ratliff, HDR Engineering, Inc.
Prioritizing Sanitary Sewer Rehabilitation with
CCTV Inspection/ Automated Rating/Ranking System
Roy D. Holmberg, Assistant General Manager, The Water Works and Sanitary Sewer Board of the City of Montgomery, Montgomery, Alabama
Kipp Nelson
Sewer Condition Assessment and Rehabilitation: A Fast-tracked Approach to a Small Communitys Problem
John Correa, District Manager, Ojai Valley Sanitary District, Ojai, California
Satish Kamath
Sylvester Hsu
RFEC/TC Technology Advancement Through GMRA Experience
Brian Mergelas, The Pressure Pipe Inspection Company Ltd., , Ontario, Canada
Stat Shatat
Xiangjie Kong
Weihua Mao
David L. Atherton
Condition Assessment of Sewers for Replacement/Rehabilitation and the Accompanying Development of a Management System
Johann W. Wessels, Project Engineer, City of Tshwane, Pretoria, South Africa
| Track: C - Pipeline Protection, Operation & Maintenance, and Special Topics |
Session 5C - Fiber Optics in Utilities
Moderator
Dr. Jey K. Jeyapalan, P.E., Fibotics International
Municipal Optical Fiber Through Existing Sewers, Storm Drains,Drinking Waterlines, and Gas Pipes May Complete the Last Mile
Dr. Jey K. Jeyapalan, Consultant, Fibotics International, New Milford, Connecticut
Third Party Pipeline Integrity Program/Construction Management
Christopher A. Pioli, Group Manager, Jacobs Consultancy, Pasadena, California
Mark P. Smith
CIPP Process: Installation of Fiber Optic Cables in Sewers
Gregory K. Anderson, President, OmniPipe Telecom, Virginia Beach, Virginia
Contractors Concept of Optical Fiber in Sewers or Abandoned Pipelines
Michael C. Welch, President, BRB Contractors, Topeka, Kansas
| Track: D - Trenchless Technology/Pipeline Renewal |
Session 5D - Water Lines Renewal I
Moderator
Timothy M. Stinson, P.E., S E A Consultants, Inc.
Structural Repair of a 42-Inch (1,067 mm) Steel Water Main
Irene McSweeney Woodfall, Director of Construction, Boston Water and Sewer Commission, Boston, Massachusetts
No Two Conduits Are Alike: The Challenges and Lessons Learned During the Rehabilitation of the Washington Aqueducts Raw Water Conduits
Nathan H. A. Cole, Chief, Civil, Structural and Mechanical Section, Washington Aqueduct, Washington, District of Columbia
Thomas P. Jacobus
External Corrosion of Water Piping Systems Causes and Solutions
James Lary, Vice President Business Development, Corrpro Companies, Inc., Medina, Ohio
David H. Kroon
Rehabilitation Management of Pre-Stressed Concrete Cylinder Pipe Using Remote Field Current /Transformer Coupling (RFEC/TC) and Other Technologies
A. Almugerhiy Abdullah, Inspection and Corrosion Protection Center
M. Elaish Reafat
M. Enawaa Khalifa
|