Technical Program Schedule at a Glance Special Events Visit Baltimore Lodging Steering Committee Registration Contact Us Sponsors and Exhibitors HomePoster Sessions Speakers Earn up to 16.5 PDH's Earn up to 16.5 PDH's


Technical Program

  • Poster Sessions
  • Conference Agenda (PDF 616kb)
    (Speakers: please click 'Conference Agenda' to view your presentation date and time)



  • Search Technical Sessions:
    Date:
    OR Tracks:
    OR Concurrent Sessions:
    Search by Speaker Name:
    Last Name
    First Name
    List By:


    Tuesday, July 15
    Period 08 | 3:00 PM - 4:20 PM
    Track: A - Asset Management, Planning & Design

    Session 8A - Pipeline Design II

    Moderator
    Lynn Osborn, P.E., Insituform Technologies

    Designing a 72-Inch Water Line on an Accelerated Schedule
    Alisa Gruber, Lockwood Andrews & Newnam, Inc., Houston, Texas
    Rafael Ortega
    Arthur Morris

    Design of Reinforced Concrete Cylinder Pipe For The Pima-Maricopa Irrigation Project
    Henry H. Bardakjian, Chief Engineer, Ameron International, Rancho Cucamonga, California

    Surge Pressure Allowance for Thrust Restraint Design of Small Diameter Water Distribution Main
    David C. Shen, Principal Engineer, WSSC, Laurel, Maryland

    The Design of Non-Circular Linings
    Olivier Thipot, SAGEP, Arcueil, France

    Track: B - Condition Assessment

    Session 8B - Geotechnical Considerations I

    Moderator
    Henry Nodarse, P.E., Bernardin, Lochmueller & Associates, Inc.

    Construction Techniques of Water Pipeline Embankment Enforcement Under the Poor Geological Conditions in Western China
    Li Meng, Visiting Professor, Johns Hopkins University, Baltimore, Maryland

    Suggested Bedding Factors for Concrete Pipe Using Controlled Low Strength Material as an Embedment
    Gerrit L. Slatter, Matrix Design Group, Colorado Springs, Colorado

    The Development of a Simplified Equation for Deflection of Buried Pipe
    Ashutosh S. Dhar, Assistant Professor, Bangladesh University of Engineering and Technology, Dhaka, Bangladesh

    Safety Assssment of Gas Pipelines Under Jamuna Bridge Access Road During Rehabilitation Works
    Ashutosh S. Dhar, Assistant Professor, Bangladesh University of Engineering and Technology, Dhaka, Bangladesh
    Munaz A. Noor
    Tahsin R. Hossain
    Salek M. Seraj
    Md. S. Hoque
    Abdul J. Khan

    Track: C - Pipeline Protection, Operation & Maintenance, and Special Topics

    Session 8C - Seismic Effects on Pipelines

    Moderator
    Dr. Mehdi S. Zarghamee, P.E., Simpson Gumpertz & Heger Inc.

    Moderator
    Mario Ordaz-Schroeder

    Experimental Study on Soil-Pipeline Interaction using EPS Backfill
    Koji Yoshizaki, Senior Researcher, Tokyo Gas Co., Ltd., Yokohama, Japan
    Takashi Sakanoue

    Some Parameters for Seismic Design and Analysis of Buried Pipelines
    Yang Han, Senior Engineer, Henan Building Research Institute, Zhengzhou, China
    Sun Shaoping
    Cui Yuping

    Seismic Vulnerability Function for High-Diameter Buried Pipelines: Mexico Citys Primary Water System Case
    Omar Pineda-Porras, Research Assistant, Instituto de Ingenierma UNAM, Distrito Federal, Mexico

    Track: D - Trenchless Technology/Pipeline Renewal

    Session 8D - Pipe Bursting/Jacking

    Moderator
    Dr. Sanjiv Gokhale, P.E., Vanderbilt University

    The Selection of Tunneling Method and the Eventual use of Pipe Jacking Techniques for the Installation of a Power Station Tailrace Tunnel in Machu Picchu Peru
    David G. Abbott, Senior Consultant, Jason Consultants Int. Inc., Washington, District of Columbia

    Ingredients for Successfully Installing Pipe using Trenchless Methods
    Tennyson M. Muindi, Senior Geotechnical Engineer, Haley & Aldrich, Inc., Boston, Massachusetts
    Daniel J. Dobbels

    Predicting Ground Displacements Caused by Pipe Splitting Operations
    David N. Chapman, The University of Birmingham, Birmingham, United Kingdom
    Andrew H. C. Chan
    Christopher D. F. Rogers
    Frederick S. K. Wan
    Paul C F. Ng

    Parameters for Designing Static Pipe Bursting Operations
    Ulf-Hilmar Hahn, Project Coordinator, Stuart Olson Construction, Alberta, Canada
    Samuel T. Ariaratnam


     

    American Society of Civil Engineers ASCE - World Headquarters
    1801 Alexander Bell
    Drive Reston, Virginia 20191-4400
    (800) 548-2723 or (703) 295-6300
    (703) 295-6144 fax
    Send questions and comments to ASCE Conferences.
    In the case of technical issues, please contact the ASCE Webmaster.