| Monday, July 14 |
| Period 02 | 10:20 AM - 11:40 AM |
| Track: B - Condition Assessment |
Session 2B - Condition Assessment for Water Lines I
Moderator
Terry Moy, P.E., CH2M Hill
Condition Assessment of 60-inch PCCP in Houston, TX
Rafael Ortega, Lockwood, Andrews & Newnam, Inc.
Gregory J. Henry
Robin S. Green
Condition Assessment and Performance of 50-Year Old LCP
Rasko P. Ojdrovic, Simpson Gumpertz & Heger Inc.
Mehdi S. Zarghamee
Murray Schroeder
Bradley A. Brooks
Condition Assessment of an 84-inch PCCP: A Case Study
Michael Higgins, Pure Technologies
Kenneth R. Herd
Michael E. Strully
An Overview of Current and Developing Technologies for Pipe Condition Assessment
Alison Ratliff, HDR Engineering, Inc.
| Period 03 | 1:00 PM - 2:20 PM |
| Track: B - Condition Assessment |
Session 3B - Condition Assessment for Water Lines II
Moderator
Randy Robertson, P.Eng., Cyntech Corporation
Prestressed Concrete Cylinder Pipeline Evaluation,
A Toolbox Approach
Richard A. Lewis, President, Openaka Corporation, Inc., Denville, New Jersey
Matt Wheatley
Innovative Approach to make a Condition Assessment using an Hydraulic Model
Eric Lalonde, Vice President R&D, Harfan Technologies, Quebec, Canada
B. Prince
Hydrostatic Pressure Testing of Prestressed Concrete Cylinder Pipe with Broken Wires
Mehdi S. Zarghamee, Principal, Simpson Gumpertz & Heger Inc., Waltham, Massachusetts
Pressure - Leakage Relation in Urban Water Distribution Systems
Reza Ardakanian, Sharif University of Technology
Ali Akbar Ghazali
| Period 04 | 3:00 PM - 4:20 PM |
| Track: B - Condition Assessment |
Session 4B - Condition Assessment for Sewer Lines I
Moderator
Frank Donaldson, Patton Rust Harris and Associates
Evaluation, Rehabilitation, and Replacement
Of the 50-Year-Old Upper Jones Falls Interceptor
Graeme C. Lake, Senior Project Manager, Patton Harris Rust & Associates, Columbia, Maryland
Craig A. Benson
Gary A. Wyatt
Wazir Qadri
Shopping for a Sag-free Sewer: Design of a Deep Sewer Line Replacement at a Major Regional Shopping Mall
Janice Ruhl, Senior Principal Engineer, Hazen and Sawyer, Fairfax, Virginia
Bruce Pierstorff
Sam Shaikh
Fuzzy Approach for Pipe Condition Assessment
Jimin Yan, Water, Engineering Development Centre, Department of Civil and Building Engineering, Loughborough University, United Kingdom
K. Vairavamoorthy
Computerized Sewer Pipe Condition Assessment
Andy Chae, Software Engineer, Blackhawk-Pipeline Assessment Service Inc., Greenville, South Carolina
Tom Iseley
Dulcy M. Abraham
| Tuesday, July 15 |
| Period 05 | 8:20 AM - 9:40 AM |
| Track: B - Condition Assessment |
Session 5B - Condition Assessment for Sewer Lines II
Moderator
Alison Ratliff, HDR Engineering, Inc.
Prioritizing Sanitary Sewer Rehabilitation with
CCTV Inspection/ Automated Rating/Ranking System
Roy D. Holmberg, Assistant General Manager, The Water Works and Sanitary Sewer Board of the City of Montgomery, Montgomery, Alabama
Kipp Nelson
Sewer Condition Assessment and Rehabilitation: A Fast-tracked Approach to a Small Communitys Problem
John Correa, District Manager, Ojai Valley Sanitary District, Ojai, California
Satish Kamath
Sylvester Hsu
RFEC/TC Technology Advancement Through GMRA Experience
Brian Mergelas, The Pressure Pipe Inspection Company Ltd., , Ontario, Canada
Stat Shatat
Xiangjie Kong
Weihua Mao
David L. Atherton
Condition Assessment of Sewers for Replacement/Rehabilitation and the Accompanying Development of a Management System
Johann W. Wessels, Project Engineer, City of Tshwane, Pretoria, South Africa
| Period 06 | 10:20 AM - 11:40 AM |
| Track: B - Condition Assessment |
Session 6B - NASSCO/WRc/PAC Pipeline Materials & Deterioration Assessment Program
Moderator
Robert Carpenter, Underground Construction Magazine
Pipeline Assessment and Certification Program (PACP)
Irvin Gemora, Executive Director, NASSCO, Inc., Chambersburg, Pennsylvania
Implementation of the Pipeline Assessment and Certification Program
Rod Thornhill, President, White Rock Consultants, Dallas, Texas
Evaluation of Collection Systems using the Aqua Zoom Camera
Stephane Joseph, Business Development Manager, InfraMetrix, Wakefield, Massachusetts
William Di Tullio
Future Outlook For Pipeline Materials, Methods, And Maintenance
Jey K. Jeyapalan, Pipeline Engineering Consultant, New Milford, Connecticut
| Period 07 | 1:20 PM - 2:20 PM |
| Track: B - Condition Assessment |
Session 7B - Pipeline Installations
Moderator
Steven Kramer, P.E., Jacobs Civil
Equipment Mounted Multi-Sensory System to Locate Pipes
Leonhard E. Bernold, Assistant Professor, NC State University, Raleigh, North Carolina
Lashminarayan Venkatesan
Sushil Suvarna
Productivity Analysis of Auger Boring Trenchless Pipe Installation Using Simulation
Ossama Salem, Assistant Professor, University of Cincinnati, Cincinnati, Ohio
N. Galani
M. Najafi
Trenchless Pipe Replacement with Rigid Pipe Using the Tenbusch Insertion Method
Al Tenbusch, Sr. , President, Tenbusch, Inc., Lewisville, Texas
Albert F. Tenbusch, Jr.
| Period 08 | 3:00 PM - 4:20 PM |
| Track: B - Condition Assessment |
Session 8B - Geotechnical Considerations I
Moderator
Henry Nodarse, P.E., Bernardin, Lochmueller & Associates, Inc.
Construction Techniques of Water Pipeline Embankment Enforcement Under the Poor Geological Conditions in Western China
Li Meng, Visiting Professor, Johns Hopkins University, Baltimore, Maryland
Suggested Bedding Factors for Concrete Pipe Using
Controlled Low Strength Material as an Embedment
Gerrit L. Slatter, Matrix Design Group, Colorado Springs, Colorado
The Development of a Simplified Equation for Deflection of Buried Pipe
Ashutosh S. Dhar, Assistant Professor, Bangladesh University of Engineering and Technology, Dhaka, Bangladesh
Safety Assssment of Gas Pipelines Under Jamuna Bridge Access Road During Rehabilitation Works
Ashutosh S. Dhar, Assistant Professor, Bangladesh University of Engineering and Technology, Dhaka, Bangladesh
Munaz A. Noor
Tahsin R. Hossain
Salek M. Seraj
Md. S. Hoque
Abdul J. Khan
| Wednesday, July 16 |
| Period 09 | 8:20 AM - 9:40 AM |
| Track: B - Condition Assessment |
Session 9B - Geotechnical Considerations II
Moderator
Tom Richardson, P.E., URS
Geotechnical Investigations for Trenchless Technology
Tom Richardson, URS Corporation, Gaithersburg, Maryland
Mohamed Younis
Paul Headland
Microtunneling Challenge in Las Vegas
Bijan Khamanian, Hobas Pipe USA, Inc.
Richard Capp
Geotechnical Risk Assessment: Estimating slope failure probability
Gerry Ferris, BGC Engineering Inc., Alberta, Canada
Alan Samchek
Andy Isherwood
TBM vs. MTBM Geotechnical Considerations
David C. Mathy, DCM/Joyal Engineering, Walnut Creek, California
Robert A. Kahl
| Period 10 | 10:20 AM - 11:40 AM |
| Track: B - Condition Assessment |
Session 10B - Subsurface Utility Engineering
Moderator
James H. Anspach, P.G., So-Deep, Inc.
Pipeline Planning Utilizing C/I ASCE 38-02
Philip K. Ryan, Principal Project Manager, CH2M Hill, Redding, California
James H. Anspach
Pipeline Relocation Design Utilizing C/I ASCE 38-02
Frank W. Huber, Senior Technical Specialist, Edwards & Kelcey, Inc., Morristown, New Jersey
James H. Anspach
Robin C. Persad
SUBSURFACE UTILITY ENGINEERING - A Technology-Driven Process that Results in Increased Safety, Fewer Claims, and Lower Costs
Nicholas M. Zembillas, Sr. Vice President, TBE Group, Inc., Clearwater, Florida
Pipeline Damage Prevention Systems
Hyung Seok Jeong, Research Assistant, Purdue University, West Lafayette, Indiana
Dulcy M. Abraham
Jeffrey J. Lew
| Period 11 | 1:00 PM - 2:20 PM |
| Track: B - Condition Assessment |
Session 11B - Investigation Innovations
Moderator
James Thomson, Jason Consultants
New And Effective Technology For Condition Assessment Of Ferrous Pipelines And Other Ferrous Structures
Martin Roubal, Rock Solid Pty Ltd., Australia
Innovative Inspection Methodologies for Wastewater Systems
Robert S. Morrison, Jason Consultants International, Washington, District of Columbia
James C. Thomson
A Three Level Strategic Approach to Investigating and Evaluating Wastewater Networks
Alan McCloskey, Amtec Surveying Inc., Atlanta, Georgia
State-of-the-Art in Sensor Technologies for Pipe Inspection
Sunil K. Sinha, Assistant Professor, The Pennsylvania State University, University Park , Pennsylvania
| Period 12 | 3:00 PM - 4:20 PM |
| Track: B - Condition Assessment |
Session 12B - CMOM Panel Discussion
Moderator
Cliff Cate, P.E., Wade and Associates, Inc.
Panelists
Kevin DeBell, USEPA
Ifty Khan, Fairfax County, VA
Paul Calamita, AquaLaw
|