Technical Program Schedule at a Glance Special Events Visit Baltimore Lodging Steering Committee Registration Contact Us Sponsors and Exhibitors HomePoster Sessions Speakers Earn up to 16.5 PDH's Earn up to 16.5 PDH's


Technical Program

  • Poster Sessions
  • Conference Agenda (PDF 616kb)
    (Speakers: please click 'Conference Agenda' to view your presentation date and time)



  • Search Technical Sessions:
    Date:
    OR Tracks:
    OR Concurrent Sessions:
    Search by Speaker Name:
    Last Name
    First Name
    List By:


    Monday, July 14
    Period 02 | 10:20 AM - 11:40 AM
    Track: D - Trenchless Technology/Pipeline Renewal

    Session 2D - Sewer Lines Renewal I

    Moderator
    Jon Doane, P.E., Black & Veatch Corporation

    Design Considerations for Improving System Efficiency and Maximization of Service Life
    Gary L. Lienberger, Ultraliner Inc., Covina, California

    Mission Possible - Baltimores Wet Weather Program Challenges
    Calvin D. Farr, Jr., Metcalf & Eddy Inc., Baltimore, Maryland

    Criteria for an Effective Lateral Renewal Project Utilizing Trenchless Technology
    Larry Kiest, Jr., LMK Enterprises, Inc., Ottawa, Illinois
    Shaun M. Flanery

    Sanitary Sewer System Rehabilitation  Investigation, Planning, Implementation, and the Theory of Chaos  A Case Study
    Wayne A. Schutz, Derry Township Municipal Authority, Hershey, Pennsylvania

    Period 03 | 1:00 PM - 2:20 PM
    Track: D - Trenchless Technology/Pipeline Renewal

    Session 3D - Sewer Lines Renewal II

    Moderator
    Jim Scott, Solution Resource

    Pipeline System Renewal Technologies
    B. Jay Schrock, JSC International Engineering

    Centrifuge Modelling of Soil Load Transfer to Flexible Sewer Liners
    John Gumbel, Technical Director, Insituform Technologies, Winchester, United Kingdom
    Aleksandar Spasojevic
    Robert Mair

    Fully Deteriorated Design in Rigid Pipe Rehabilitation with Flexible Liners
    George McAlpine, President & CEO, Danby of North America, Inc., Cary, North Carolina

    Period 04 | 3:00 PM - 4:20 PM
    Track: D - Trenchless Technology/Pipeline Renewal

    Session 4D - Sewer Lines Renewal III

    Moderator
    John Struzziery, P.E., SEA Consultants

    An Opinionated Review of Trenchless Technologies for Pipeline Rehabilitation
    Henry R. Derr, Vice President and Trenchless Technology Group Leader, Metcalf & Eddy, Inc., Raleigh, North Carolina

    The Road to Rehabilitation of a 42-Inch Diameter Interceptor
    John F. Trypus, Department of Engineering and Technical Services, DC Water and Sewer Authority, Washington, District of Columbia
    William Darrow
    John Mattingly

    Planning, Design, and Implementation of Large Diameter Sewer Rehabilitation
    Paul V. Savard, Project Manager, Jacobs Civil Inc., Boston, Massachusetts
    Eleanor Duffy
    David K. Pottle
    John E. Murphy

    Automated Assessment Technologies for Sanitary Sewer Evaluation
    Sanjiv Gokhale, Vanderbilt University, Nashville, Tennessee
    Makarand Hastak

    Tuesday, July 15
    Period 05 | 8:20 AM - 9:40 AM
    Track: D - Trenchless Technology/Pipeline Renewal

    Session 5D - Water Lines Renewal I

    Moderator
    Timothy M. Stinson, P.E., S E A Consultants, Inc.

    Structural Repair of a 42-Inch (1,067 mm) Steel Water Main
    Irene McSweeney Woodfall, Director of Construction, Boston Water and Sewer Commission, Boston, Massachusetts

    No Two Conduits Are Alike: The Challenges and Lessons Learned During the Rehabilitation of the Washington Aqueducts Raw Water Conduits
    Nathan H. A. Cole, Chief, Civil, Structural and Mechanical Section, Washington Aqueduct, Washington, District of Columbia
    Thomas P. Jacobus

    External Corrosion of Water Piping Systems  Causes and Solutions
    James Lary, Vice President Business Development, Corrpro Companies, Inc., Medina, Ohio
    David H. Kroon

    Rehabilitation Management of Pre-Stressed Concrete Cylinder Pipe Using Remote Field Current /Transformer Coupling (RFEC/TC) and Other Technologies
    A. Almugerhiy Abdullah, Inspection and Corrosion Protection Center
    M. Elaish Reafat
    M. Enawaa Khalifa

    Period 06 | 10:20 AM - 11:40 AM
    Track: D - Trenchless Technology/Pipeline Renewal

    Session 6D - Water & Sewer Lines Renewal

    Moderator
    Joseph P. Castronovo, P.E., CH2M HILL

    So You Thought Water Main Repairs Were Straightforward?
    Joseph Kavanagh, Metcalf & Eddy, Inc.
    Warren Williams
    Jaswant Dhupar

    Carbon FRP Strengthening of PCCP Aqueducts
    Tarek Alkhrdaji, Structural Preservation Systems, Inc.
    Jay Thomas

    84-inch Aerial Water Main over US 59: Limiting Collateral Damage by a Rupture
    Emmanuel De Pau, Lockwood, Andrews & Newnam, Inc., Houston, Texas
    Charles Troy Anthony, Lockwood, Andrews & Newnam, Inc.

    Renewal of Fully Deteriorated Sewers - The Importance of Engineering Due Diligence
    Randy Cooper

    Period 07 | 1:20 PM - 2:20 PM
    Track: D - Trenchless Technology/Pipeline Renewal

    Session 7D - Water Lines Renewal II

    Moderator
    William E. Shook, AP/M PERMAFORM

    Prioritizing Water Main Renewal Program
    Arun K. Deb, Vice President, Weston Solutions, Inc., West Chester, Pennsylvania
    Jerry K. Snyder
    G.V. Logananthan
    N. Agbenowski
    Frank Grablutz

    Water Main Rehabilitation Using Rapid-Setting Polymeric Lining Material  Sandwich, MA
    Douglas B. Gove, Jr., Project Engineer, Metcalf & Eddy, Inc., Wakefield, Massachusetts
    Peter Oram
    Daniel H. Mahoney, Jr.

    Future of Americas Water is in Our Hands
    Jey K. Jeyapalan, Pipeline Engineering Consultant, New Milford, Connecticut

    Period 08 | 3:00 PM - 4:20 PM
    Track: D - Trenchless Technology/Pipeline Renewal

    Session 8D - Pipe Bursting/Jacking

    Moderator
    Dr. Sanjiv Gokhale, P.E., Vanderbilt University

    The Selection of Tunneling Method and the Eventual use of Pipe Jacking Techniques for the Installation of a Power Station Tailrace Tunnel in Machu Picchu Peru
    David G. Abbott, Senior Consultant, Jason Consultants Int. Inc., Washington, District of Columbia

    Ingredients for Successfully Installing Pipe using Trenchless Methods
    Tennyson M. Muindi, Senior Geotechnical Engineer, Haley & Aldrich, Inc., Boston, Massachusetts
    Daniel J. Dobbels

    Predicting Ground Displacements Caused by Pipe Splitting Operations
    David N. Chapman, The University of Birmingham, Birmingham, United Kingdom
    Andrew H. C. Chan
    Christopher D. F. Rogers
    Frederick S. K. Wan
    Paul C F. Ng

    Parameters for Designing Static Pipe Bursting Operations
    Ulf-Hilmar Hahn, Project Coordinator, Stuart Olson Construction, Alberta, Canada
    Samuel T. Ariaratnam

    Wednesday, July 16
    Period 09 | 8:20 AM - 9:40 AM
    Track: D - Trenchless Technology/Pipeline Renewal

    Session 9D - Horizontal Directional Drilling I

    Moderator
    John Hair, P.E., J.D., Hair and Associates, Inc.

    Predicting and Controlling Hydraulic Fracturing During Horizontal Directional Drilling
    Samuel T. Ariaratnam, Associate Professor, Arizona State University, Tempe, Arizona
    Richard M. Stauber
    Jason Bell
    Bruce Harbin
    Frank Canon

    Analysis of Theoretical Versus Actual HDD Pulling Loads
    Jeffrey S. Puckett, Project Manager, J. D. Hair & Associates, Inc., Tulsa, Oklahoma

    Impact of Tortuosity in Drilling and Reaming of Long HDD Holes in Hard Rock
    Andrew Lukas, Managing Director, AJ Lucas Group Ltd, Ryde, Australia

    Development of KCM130 Steerable Air-powered Impact Mole for Directional Boring
    Jianming Peng, Lecturer, Jilin University, Changchun City, China
    Kun Yin
    Maosen Wang
    Huiwen Xu
    Jijun Su

    Period 10 | 10:20 AM - 11:40 AM
    Track: D - Trenchless Technology/Pipeline Renewal

    Session 10D - Horizontal Directional Drilling II

    Moderator
    Vince Rybel, P.E., CH2M Hill

    Water and Sewer Construction with Horizontal Directional Drilling Equipment
    Gary Lawson, Manager of Market Development, The Charles Machine Works, Inc., Perry, Oklahoma

    Analysis of Heave and Subsidence Risk for Horizontal Directional Drilling
    Mathew Francis, URS Corporation
    James Kwong
    Kristi Kawamura

    Kick in the Tail Saves HDD Shore Approaches
    Hugh W. ODonnell, ODonnell Associates, Inc., Fresno, Texas
    Eric R. Skonberg

    Using Ductile Iron Pipe for Horizontal Directional Drilling Installations
    Richard W. (Dick) Rowell, Senior Sales Engineer, United States Pipe and Foundry Company, Inc., Birmingham, Alabama

    Period 11 | 1:00 PM - 2:20 PM
    Track: D - Trenchless Technology/Pipeline Renewal

    Session 11D - Microtunneling & Tunneling I

    Moderator
    David G. Abbott, C.Eng., Jason Consultants International, Inc.

    The use of Microtunneling Techniques for Sewer Installation in a Challenging Caribbean Environment
    Peter G. Galbraith, P.Eng., Program Manager, Earth Tech Inc., Roswell, Georgia

    Large Diameter Pipe Design Under Urban Constraints
    Jennifer McNutt, Project Engineer, Black & Veatch, Sacramento, California
    Mike Middleton
    Dave Bennett
    Bruce Corwin
    Brett Grant

    Construction Management Considerations and Techniques Used to Microtunnel a New Sewer Main Under Pacific Coast Highway for the City of Santa Monica
    Jack Schroeder, Program Manager, Disaster Recovery Office, City of Santa Monica, Santa Monica, California
    Susan Lowell
    Ralph T. Eberts
    Monte L. Wilson
    Chuck R. Parker

    Microtunneling Beneath Historic Alexandria, Virginia
    Robert H. Zeiller, Crescent Resources, LLC
    Thomas J. Meinhart, Jacobs Civil Inc., St. Louis, Missouri
    William E. Rice
    Andy J. Robinson

    Period 12 | 3:00 PM - 4:20 PM
    Track: D - Trenchless Technology/Pipeline Renewal

    Session 12D - Microtunneling and Tunneling II

    Moderator
    Dr. Alan Atalah, P.E., Bowling Green State University

    Development of Design Options for the Installation of 10 Km of Sewer in Very Soft Lacustrian Clays
    James Thomson, Jason Consultants International, Inc.
    David G. Abbott

    Houstons Hidden Tunnels: Trials and Tribulations of Large Diameter Tunnels
    Rafael Ortega, Lockwood, Andrews & Newnam, Inc.
    Gregory J. Henry
    Hamlet Hovsepain

    New Intake Tunnel Delivers Cooling Water to the Pentagon
    Steven R. Kramer, Principal of Trenchess & Water Resources Group, Jacobs Civil Inc., Arlington, Virginia
    Jerry Nystrom
    John Woodson
    Brian T. Dziekonski

    The Design and Construction of Large Diameter Pipelines In a Shaft and Tunnel System  Hong Kong Experience
    Alan H. L. Man, Director, Black & Veatch Hong Kong Limited, NT, Hong Kong
    K.Y. Mak


     

    American Society of Civil Engineers ASCE - World Headquarters
    1801 Alexander Bell
    Drive Reston, Virginia 20191-4400
    (800) 548-2723 or (703) 295-6300
    (703) 295-6144 fax
    Send questions and comments to ASCE Conferences.
    In the case of technical issues, please contact the ASCE Webmaster.