| Monday, July 14 |
| Period 02 | 10:20 AM - 11:40 AM |
| Track: D - Trenchless Technology/Pipeline Renewal |
Session 2D - Sewer Lines Renewal I
Moderator
Jon Doane, P.E., Black & Veatch Corporation
Design Considerations for Improving System Efficiency and Maximization of Service Life
Gary L. Lienberger, Ultraliner Inc., Covina, California
Mission Possible - Baltimores Wet Weather Program Challenges
Calvin D. Farr, Jr., Metcalf & Eddy Inc., Baltimore, Maryland
Criteria for an Effective Lateral Renewal Project
Utilizing Trenchless Technology
Larry Kiest, Jr., LMK Enterprises, Inc., Ottawa, Illinois
Shaun M. Flanery
Sanitary Sewer System Rehabilitation Investigation, Planning, Implementation, and the Theory of Chaos A Case Study
Wayne A. Schutz, Derry Township Municipal Authority, Hershey, Pennsylvania
| Period 03 | 1:00 PM - 2:20 PM |
| Track: D - Trenchless Technology/Pipeline Renewal |
Session 3D - Sewer Lines Renewal II
Moderator
Jim Scott, Solution Resource
Pipeline System Renewal Technologies
B. Jay Schrock, JSC International Engineering
Centrifuge Modelling of Soil Load Transfer to Flexible Sewer Liners
John Gumbel, Technical Director, Insituform Technologies, Winchester, United Kingdom
Aleksandar Spasojevic
Robert Mair
Fully Deteriorated Design in Rigid Pipe Rehabilitation with Flexible Liners
George McAlpine, President & CEO, Danby of North America, Inc., Cary, North Carolina
| Period 04 | 3:00 PM - 4:20 PM |
| Track: D - Trenchless Technology/Pipeline Renewal |
Session 4D - Sewer Lines Renewal III
Moderator
John Struzziery, P.E., SEA Consultants
An Opinionated Review of Trenchless Technologies for Pipeline Rehabilitation
Henry R. Derr, Vice President and Trenchless Technology Group Leader, Metcalf & Eddy, Inc., Raleigh, North Carolina
The Road to Rehabilitation of a 42-Inch Diameter Interceptor
John F. Trypus, Department of Engineering and Technical Services, DC Water and Sewer Authority, Washington, District of Columbia
William Darrow
John Mattingly
Planning, Design, and Implementation of Large Diameter Sewer Rehabilitation
Paul V. Savard, Project Manager, Jacobs Civil Inc., Boston, Massachusetts
Eleanor Duffy
David K. Pottle
John E. Murphy
Automated Assessment Technologies for Sanitary Sewer Evaluation
Sanjiv Gokhale, Vanderbilt University, Nashville, Tennessee
Makarand Hastak
| Tuesday, July 15 |
| Period 05 | 8:20 AM - 9:40 AM |
| Track: D - Trenchless Technology/Pipeline Renewal |
Session 5D - Water Lines Renewal I
Moderator
Timothy M. Stinson, P.E., S E A Consultants, Inc.
Structural Repair of a 42-Inch (1,067 mm) Steel Water Main
Irene McSweeney Woodfall, Director of Construction, Boston Water and Sewer Commission, Boston, Massachusetts
No Two Conduits Are Alike: The Challenges and Lessons Learned During the Rehabilitation of the Washington Aqueducts Raw Water Conduits
Nathan H. A. Cole, Chief, Civil, Structural and Mechanical Section, Washington Aqueduct, Washington, District of Columbia
Thomas P. Jacobus
External Corrosion of Water Piping Systems Causes and Solutions
James Lary, Vice President Business Development, Corrpro Companies, Inc., Medina, Ohio
David H. Kroon
Rehabilitation Management of Pre-Stressed Concrete Cylinder Pipe Using Remote Field Current /Transformer Coupling (RFEC/TC) and Other Technologies
A. Almugerhiy Abdullah, Inspection and Corrosion Protection Center
M. Elaish Reafat
M. Enawaa Khalifa
| Period 06 | 10:20 AM - 11:40 AM |
| Track: D - Trenchless Technology/Pipeline Renewal |
Session 6D - Water & Sewer Lines Renewal
Moderator
Joseph P. Castronovo, P.E., CH2M HILL
So You Thought Water Main Repairs Were Straightforward?
Joseph Kavanagh, Metcalf & Eddy, Inc.
Warren Williams
Jaswant Dhupar
Carbon FRP Strengthening of PCCP Aqueducts
Tarek Alkhrdaji, Structural Preservation Systems, Inc.
Jay Thomas
84-inch Aerial Water Main over US 59: Limiting Collateral Damage by a Rupture
Emmanuel De Pau, Lockwood, Andrews & Newnam, Inc., Houston, Texas
Charles Troy Anthony, Lockwood, Andrews & Newnam, Inc.
Renewal of Fully Deteriorated Sewers - The Importance of Engineering Due Diligence
Randy Cooper
| Period 07 | 1:20 PM - 2:20 PM |
| Track: D - Trenchless Technology/Pipeline Renewal |
Session 7D - Water Lines Renewal II
Moderator
William E. Shook, AP/M PERMAFORM
Prioritizing Water Main Renewal Program
Arun K. Deb, Vice President, Weston Solutions, Inc., West Chester, Pennsylvania
Jerry K. Snyder
G.V. Logananthan
N. Agbenowski
Frank Grablutz
Water Main Rehabilitation Using Rapid-Setting Polymeric Lining Material Sandwich, MA
Douglas B. Gove, Jr., Project Engineer, Metcalf & Eddy, Inc., Wakefield, Massachusetts
Peter Oram
Daniel H. Mahoney, Jr.
Future of Americas Water is in Our Hands
Jey K. Jeyapalan, Pipeline Engineering Consultant, New Milford, Connecticut
| Period 08 | 3:00 PM - 4:20 PM |
| Track: D - Trenchless Technology/Pipeline Renewal |
Session 8D - Pipe Bursting/Jacking
Moderator
Dr. Sanjiv Gokhale, P.E., Vanderbilt University
The Selection of Tunneling Method and the Eventual use of Pipe Jacking Techniques for the Installation of a Power Station Tailrace Tunnel in Machu Picchu Peru
David G. Abbott, Senior Consultant, Jason Consultants Int. Inc., Washington, District of Columbia
Ingredients for Successfully Installing Pipe using Trenchless Methods
Tennyson M. Muindi, Senior Geotechnical Engineer, Haley & Aldrich, Inc., Boston, Massachusetts
Daniel J. Dobbels
Predicting Ground Displacements Caused by Pipe Splitting Operations
David N. Chapman, The University of Birmingham, Birmingham, United Kingdom
Andrew H. C. Chan
Christopher D. F. Rogers
Frederick S. K. Wan
Paul C F. Ng
Parameters for Designing Static Pipe Bursting Operations
Ulf-Hilmar Hahn, Project Coordinator, Stuart Olson Construction, Alberta, Canada
Samuel T. Ariaratnam
| Wednesday, July 16 |
| Period 09 | 8:20 AM - 9:40 AM |
| Track: D - Trenchless Technology/Pipeline Renewal |
Session 9D - Horizontal Directional Drilling I
Moderator
John Hair, P.E., J.D., Hair and Associates, Inc.
Predicting and Controlling Hydraulic Fracturing During Horizontal Directional Drilling
Samuel T. Ariaratnam, Associate Professor, Arizona State University, Tempe, Arizona
Richard M. Stauber
Jason Bell
Bruce Harbin
Frank Canon
Analysis of Theoretical Versus Actual HDD Pulling
Loads
Jeffrey S. Puckett, Project Manager, J. D. Hair & Associates, Inc., Tulsa, Oklahoma
Impact of Tortuosity in Drilling and Reaming of Long HDD Holes in Hard Rock
Andrew Lukas, Managing Director, AJ Lucas Group Ltd, Ryde, Australia
Development of KCM130 Steerable Air-powered Impact Mole for Directional Boring
Jianming Peng, Lecturer, Jilin University, Changchun City, China
Kun Yin
Maosen Wang
Huiwen Xu
Jijun Su
| Period 10 | 10:20 AM - 11:40 AM |
| Track: D - Trenchless Technology/Pipeline Renewal |
Session 10D - Horizontal Directional Drilling II
Moderator
Vince Rybel, P.E., CH2M Hill
Water and Sewer Construction with Horizontal Directional Drilling Equipment
Gary Lawson, Manager of Market Development, The Charles Machine Works, Inc., Perry, Oklahoma
Analysis of Heave and Subsidence Risk for Horizontal Directional Drilling
Mathew Francis, URS Corporation
James Kwong
Kristi Kawamura
Kick in the Tail Saves HDD Shore Approaches
Hugh W. ODonnell, ODonnell Associates, Inc., Fresno, Texas
Eric R. Skonberg
Using Ductile Iron Pipe for Horizontal Directional Drilling Installations
Richard W. (Dick) Rowell, Senior Sales Engineer, United States Pipe and Foundry Company, Inc., Birmingham, Alabama
| Period 11 | 1:00 PM - 2:20 PM |
| Track: D - Trenchless Technology/Pipeline Renewal |
Session 11D - Microtunneling & Tunneling I
Moderator
David G. Abbott, C.Eng., Jason Consultants International, Inc.
The use of Microtunneling Techniques for Sewer Installation in a Challenging Caribbean Environment
Peter G. Galbraith, P.Eng., Program Manager, Earth Tech Inc., Roswell, Georgia
Large Diameter Pipe Design Under Urban Constraints
Jennifer McNutt, Project Engineer, Black & Veatch, Sacramento, California
Mike Middleton
Dave Bennett
Bruce Corwin
Brett Grant
Construction Management Considerations and Techniques Used to Microtunnel a New Sewer Main Under Pacific Coast Highway for the City of Santa Monica
Jack Schroeder, Program Manager, Disaster Recovery Office, City of Santa Monica, Santa Monica, California
Susan Lowell
Ralph T. Eberts
Monte L. Wilson
Chuck R. Parker
Microtunneling Beneath Historic Alexandria, Virginia
Robert H. Zeiller, Crescent Resources, LLC
Thomas J. Meinhart, Jacobs Civil Inc., St. Louis, Missouri
William E. Rice
Andy J. Robinson
| Period 12 | 3:00 PM - 4:20 PM |
| Track: D - Trenchless Technology/Pipeline Renewal |
Session 12D - Microtunneling and Tunneling II
Moderator
Dr. Alan Atalah, P.E., Bowling Green State University
Development of Design Options for the Installation
of 10 Km of Sewer in Very Soft Lacustrian Clays
James Thomson, Jason Consultants International, Inc.
David G. Abbott
Houstons Hidden Tunnels: Trials and Tribulations of Large Diameter Tunnels
Rafael Ortega, Lockwood, Andrews & Newnam, Inc.
Gregory J. Henry
Hamlet Hovsepain
New Intake Tunnel Delivers Cooling Water to the Pentagon
Steven R. Kramer, Principal of Trenchess & Water Resources Group, Jacobs Civil Inc., Arlington, Virginia
Jerry Nystrom
John Woodson
Brian T. Dziekonski
The Design and Construction of Large Diameter Pipelines In a Shaft and Tunnel System Hong Kong Experience
Alan H. L. Man, Director, Black & Veatch Hong Kong Limited, NT, Hong Kong
K.Y. Mak
|