Andrew Griezic joined Buckland & Taylor Ltd. in 1997. Since that time he has developed extensive experience in design check, detailed construction engineering analysis, modeling and design of erection schemes and temporary works for cable-stayed bridges. He has worked on design or construction engineering for seven cable-stayed bridges. He was the Project Manager for the detailed design and construction engineering of North Arm Bridge, the first extradosed bridge in North America.

More with this instructor