photo of happy family drinking water

This is a paid advertisement. The views expressed are those of DIPRA and do not necessarily reflect the opinions or positions of ASCE.

Civil engineers carry a particular kind of responsibility: the decisions made on a project today often outlive the careers of the people who made them. Water and wastewater infrastructure is typically designed for a 75- to 100-year service life, which means material selection has consequences that compound for decades.

That's the lens through which an ongoing EPA regulatory review is worth watching.

The EPA's Vinyl Chloride Risk Evaluation

The U.S. Environmental Protection Agency is conducting a risk evaluation of vinyl chloride under the Toxic Substances Control Act (TSCA). Vinyl chloride is a known human carcinogen and the primary building block used to manufacture polyvinyl chloride (PVC), a material used widely in water infrastructure, including pipes.

The evaluation remains ongoing, with no final risk determination issued. But for engineers, the review is a reminder that infrastructure specified under today's standards can still be shaped by tomorrow's regulatory and scientific findings.

Understanding Vinyl Chloride

Vinyl chloride is a colorless, flammable gas produced industrially, primarily to manufacture PVC used in pipe, wire and cable coatings, and packaging.

The chemical has been studied for decades. Organizations including the International Agency for Research on Cancer (IARC) and the National Toxicology Program (NTP) have linked vinyl chloride exposure to increased risk of several cancers, including hepatic angiosarcoma, a rare liver cancer, as well as liver, brain, and lung cancer, lymphoma, and leukemia.

EPA's current evaluation examines potential risk across the chemical's full lifecycle: production, processing, use, and disposal.

Why This Matters for the Engineering Community

TSCA gives EPA authority to evaluate chemicals that may pose unreasonable risk to human health or the environment. The current review doesn't target PVC pipe directly, but because vinyl chloride is foundational to PVC production, its outcome could inform future decisions on material specification, risk management, and regulatory compliance.

For engineers managing capital projects with multi-decade horizons, that's a variable worth tracking alongside the usual performance, cost, and constructability criteria — one more input into the professional stewardship civil engineers are expected to bring to public infrastructure investment.

Making Informed Material Decisions

Material selection has always meant weighing durability, performance, and cost against long-term risk. Staying current on regulatory developments — even those still in progress — is part of the due diligence the profession brings to public works.

As EPA's evaluation continues, engineers and utility leaders have the opportunity to follow the science and the regulatory process, so material decisions reflect the fullest picture available.

To learn more about vinyl chloride, the EPA's ongoing review, and what it could mean for water infrastructure material selection, visit Informed Water Choices.

THIS CONTENT SPONSORED BY